• <object id="0c4o8"></object>
  • <tbody id="0c4o8"><menu id="0c4o8"></menu></tbody>
    簡體中文簡體中文

    Psc green office

    • Scope of application: Kechuang Park Office Building, Pioneer Park Office Building, Commercial Office Building, Industrial Park Office Building
    • The prefabricated and assembled construction of the exterior wall of the office building structure is realized by using the assembled steel structure and the assembled integrated module floor system, which saves more than 50% of the construction time. To achieve green construction site construction, and the application of serialized external walls and internal products, to achieve the stereotyped demand for office products, to provide customers with high-end office building products.


      Scope of application: Kechuang Park Office Building, Pioneer Park Office Building, Commercial Office Building, Industrial Park Office Building


      5ba34adc03f9b.jpg

    在線咨詢
    色婷婷激婷婷深爱五月
  • <object id="0c4o8"></object>
  • <tbody id="0c4o8"><menu id="0c4o8"></menu></tbody>